Wednesday 31 March 2010

AIRPORT REVIEW!! SUVARNABHUMI AIRPORT, THAILAND

**THE RESURRECTION OF THE LEGENDARY FAILURE**


Suvarnabhumi Airport is one of the newest airport of its size that opened recently.  Opened in 2006, its history dated back to 1960s where the second international airport for Bangkok was planned.  It took almost a decade for the Thai government during that time to purchase the 8,000 acre (32 km²) in a once low-lying marsh, formerly known as Nong Ngu Hao (Thai: หนองงูเห่า, lit. "Cobra Swamp")  in 1973 but the project was shelved and critised as one of the legendary failure since then.  Another well known project which failed to finish is the Bangkok Elevated Road and Train System (BERTS, Thai: โครงการระบบการขนส่งทางรถไฟยกระดับในกรุงเทพมหานคร), commonly known as the Hopewell Project (โครงการโฮปเวลล์) which was cancelled in 1998 due to the heavily corruption problem and the Asian financial crisis.


Although, the need to build a second international airport for Bangkok to add to - if not to replace - the Don Mueang International Airport which was opened commercially since 1924, is still there and every time the Thai government concerned about the need, the Nong Ngu Hao project seemed like a solution to the problem, the project did not have a serious progress until 1996 when  the"New Bangkok International Airport" company was formed.  After a long land reclaimation processes, the construction began in 2002.  In 2005, the Airport of Thailand Plc. took control of the construction supervision ad management.  After many criticism, corruption, and budget overruns, the phase one of the airport was finished (using ฿155 billion - that's US$3.8 billion), commissioned, and opened for commercial purpose on 28 September 2006.


Despite the flaws and problems found later, the Suvarnabhumi Airport (meaning 'Golden Land') has the world's largest terminal built in one phase (currently fourth biggest passenger building in the world) and the world's tallest air-traffic control tower, with 2 parallel runways and the passenger capacity of 45 million passengers a year.  The airport can be upgraded to have 4 runways, 2 satellite buildings, and 1 low cost terminal to handle upto 135 million passengers.  Thus concludes this half century project.


**MY FIRST TIME AT SUVARNABHUMI AIRPORT**



On my part, I visited this airport before it's opened commercially on the business purpose and was stunned by its size.  My first flight at the golden land airport happened only a month after its grand opening.  I has been appointed to join in the ASEAN GMP Task force which is a part of the 12th ASEAN Consultative Committee for Standard and Quality - Pharmaceutical Product Working Group (ACCSQ - PPWG) Meeting in Jakarta, Indonesia.  Since it was my second time in the same city and I did not travel to many new places, the highlight of that trip was the brand new airport.
 
The pasenger terminal is extremely huge.  One wrong turn and you may miss the flight. Apart from the fact that the airport was designed by one of the greatest in this job, I could not like the look of the passenger building, especially from the inside.  'It looks like a series of tent and scrap metals.  Just a month and it looks old already' I thought.  It also lacks the oriental touch which I think is more important than the innovative design.
 
I proved I was not the only one who criticised about the eastern art.  When I entered the duty free area, I found places were decorated with very 'Thai' decorations trying to show the uniqueness of the culture.  One of the great decorations is the "Scene of The Churning of The Milk Ocean" sculpture.
 
 
There was a sign written that "This scene depict the Vishnu Kurmavatara and the churning of the Milk Ocean. The naga (the king of serpents), Vasuki, is curled around the mountain Mandara. Vishnu, incarnated in the form of a great turtle, supports the mountain on his back. Devas (demigods) and Asuras (demons) pull on the naga's body to churn the water of the ocean for the thousands of years in order to produce the nectar of immortality, Amrita.  From the churning, numerous opulent items produced, including Dhanvantari carrying the pot of Amrita.  In the end, the cooperation between Devas and Asuras is shattered.  The Devas, fulfill their plan of acquiring Amrita, disperse the Asuras out of Heaven to the Underworld."


On the way to my Departure gate, there are a few more spectacular things to enlighten my mood on the airport poor signing system and the toilets.  The tunnel to the departure gate also looked stunning, at least in pictures.


On my departure and arrival, the airport control was working smoothly through contact gates.  The place was far less crowded than the old Don Mueang International Airport.  I walked to the baggage claim area which became my favourite path in the airport with the fantastic wall paintings and the duplicates of the Bangkok City Protection Giants to welcome me home... To put it in another context... Welcome to Thailand!!

== Suvarnabhumi Airport Short Fact File ==
Airport Type : Public
Operator : Airport of Thailand Plc. (AOT)
Serves: Bangkok
Website: SuvarnabhumiAirport.com

2 comments:

Unknown said...

I am thankful for this blog to gave me much knowledge regarding my area of work. I also want to make some addition on this platform which must be in knowledge of people who really in need. Thanks.
รีโนเวท ตึกแถว

Unknown said...

Sometime few educational blogs become very helpful while getting relevant and new information related to your targeted area. As I found this blog and appreciate the information delivered to my database.เลนส์โปรเกรสซีฟ